Book-matched marble showerStandalone tiling
Just the tiling — walls, floors, wet rooms, large format and natural stone.
From £65/m² · 2–6 working days for a typical bathroom
Sometimes you do not need a full refit — you need the tiling done well. A tiled surface reads as one thing, so anything out of true is obvious: a joint that drifts, a thin cut in a corner, a pattern that is heavy on one side.
We take tiling on as a standalone job when the rest of the room is sound. Most of the work is under the tile: getting the substrate flat, rigid, dry and correctly prepared for the format you have chosen.
Anything over about 600 mm needs a flat substrate, full adhesive coverage and a levelling system on every joint. We prepare to a tight tolerance and back-butter, because a hollow spot under a large porcelain tile becomes a crack.
Stone is dry-laid first so the veining is arranged deliberately, fixed with non-staining adhesive, and sealed before and after grouting. Edges are mitred or finished with a stone trim, not a plastic one.
Cracked or drummy tiles cut out and replaced, failed grout raked out and renewed, tired silicone stripped and re-run. We find out why the original failed first, so the repair lasts.


Richmond, TW10 · 4 m²
Book-matched marble showerHow it goes
Five stages. For each one: what we do, how long it takes, what we need from you, and when you pay.
We come to the room, measure up, check the substrate, the pipework and the electrics, and talk through layout and materials. We flag anything that affects the price or the schedule — damp, movement, notifiable work, lease conditions.
A written quote with the scope wall by wall, the preparation and tanking included, how edges and transitions are finished, and an indicative day-by-day schedule. It does not move unless you change the brief.
The old room comes out, waste is removed, and the substrate is exposed and assessed properly. If something genuinely hidden turns up, we stop and show you before spending your money.
First fix, tanking (photographed before it disappears), plastering or boarding, then setting out and tiling, then second fix. One team throughout, a photo update every evening.
Grout, silicone, sealing, a full clean, and a snag walk-through together. You list anything that is not right; we put it back before we leave. You get the tile and product details for your records.
Questions
A typical bathroom is 16–20 working days on site; a kitchen 13–18; a standalone tiling job 2–6. Tanking, large-format tile, natural stone and pattern work add time. You get an indicative day-by-day schedule with the quote, and a daily photo update once we start.
You buy the sanitaryware, tiles, brassware, units and worktops, so you stay in control of the choice and the spend. We give you a spec sheet with exact quantities (including a 10–15% tile allowance for cuts) and tell you when things need to be on site. We supply everything that goes behind the finish — adhesives, tanking, boards, grout, silicone, trims.
We finish with a snag walk-through together before the final payment — you list anything that is not right and we put it back before we leave.
Payment is in stages tied to progress — a deposit to book the slot and order consumables, then payments at agreed points, with the final payment only after the snag walk-through. We do not offer credit ourselves; some clients use a separate home-improvement loan.
Talk to us
Send a couple of photos and where you are. We’ll call back the same working day with a straight answer on whether we’re the right fit and a rough range.
Where we work
All London boroughs, and north-west from Harrow out to Rickmansworth, Amersham, Chesham and the Chiltern towns around them.